Steam turbine power plant setup

An oil-fired once-through steam boiler produces wet steam that is turned into superheated steam by means of a super heater. The boiler?s short heat-up time means rapid steam generation is possible. Load is applied to the turbine with a generator. The turbine output is determined by speed and torque. The feed water circuit is fitted with a complete water treatment system, which consists of a regenerable ion exchanger and chemical dosing. Downstream of the turbine, the steam is condensed and returned to the boiler. Sensors record the temperature, pressure, speed, and flow rate at all relevant points. The measured values can be read on digital displays. At the same time, the measured values can also be transmitted directly to a PC via USB. The data acquisition software is included. The control panel includes a clear process schematic of the plant. The system is monitored and controlled by a programmable logic controller (PLC). The experimental plant is built in accordance with statutory safety regulations and includes the mandatory safety facilities. The steam generator is type tested and does not require specific permissions. The plant can optionally be operated with the cooling tower.

Share:

Important!

There are a lot of advertisers on Advertigo. We cannot check them one by one.

You work hard for your money and you want a company you can rely on when you are buying or selling things. That’s why we want to help you protect yourself from fraud. In this section, you’ll find informative tips and other useful material to stay informed and help reduce your chances of falling victim to scammers.

Please understand that Advertigo.net is a free service to help buyers and sellers (and etc.) find one another. Advertigo.net is not involved in any transactions and can not police the actions of our many users.