What are the details required to make cbt

Before starting CBT, OEM must finalize the duration of CBT. In some military RFP/SCOPE duration of CBT is mentioned along with the duration of each topic, subtopic, and sub–sub-topic. If that is not mentioned then OEM has to make a Table of content first and mention the approximate time to cover each topic, subtopic, and sub–sub-topic. It is called CCID, or course content Identified document. It is basically a full detailed Table of content and duration. Once the CCID document is ready then, the Vendor will collect raw content and make a DCID document. Which means a Detailed Course content document. It can also be called a storyboard. This storyboard will have complete content for every topic, subtopic, and sub–sub-topic. Also, this document will contain the presentation methodology. It means is this particular sub-topic is being covered as Video, or Image, Text or animation if animation, 2d or 3d, etc. Based on the number of words we can arrive at a number of hours. If the number of hours is more than deliverable, we can concisely edit or delete unwanted text.

02-09-2025 INDIA, Hyderabad
साझा करें:

महत्वपूर्ण!

Advertigo पर बहुत सारे विज्ञापनदाता हैं। हम उन्हें एक-एक करके जाँच नहीं कर सकते।

आप अपनी मेहनत की कमाई के लिए एक भरोसेमंद कंपनी चाहते हैं। इसीलिए हम आपको धोखाधड़ी से बचाने में मदद करना चाहते हैं। इस अनुभाग में आपको जानकारीपूर्ण सुझाव और अन्य उपयोगी सामग्री मिलेगी जो आपको सतर्क रहने और ठगों के शिकार होने की संभावना को कम करने में मदद करेगी।

कृपया समझें कि Advertigo.net खरीदारों और विक्रेताओं को एक-दूसरे को खोजने में मदद करने के लिए एक निःशुल्क सेवा है। Advertigo.net किसी भी लेन-देन में शामिल नहीं है और हमारे उपयोगकर्ताओं की गतिविधियों पर नजर नहीं रख सकता।